一本无码中文字幕高清在线

<dfn id="3gbql"><s id="3gbql"></s></dfn>

      <th id="3gbql"><video id="3gbql"><acronym id="3gbql"></acronym></video></th>

      1. <th id="3gbql"></th>

      2. <code id="3gbql"><nobr id="3gbql"><track id="3gbql"></track></nobr></code>
          <strike id="3gbql"><address id="3gbql"></address></strike>
        1. <nav id="3gbql"></nav>

          project

          PRODUCTS SERVICE & SPARE PARTS PROJECTS ABOUT TRUEMAX CONTACT US
          Home >  project >  Concrete Machinery >  DOHA METRO-GREEN LINE
          project

          DOHA METRO-GREEN LINE

          Adding time: 2019.08.30

          Share
          Concrete Placing Boom in Malaysia

          Project Description:

          Total construction mileage 300km include 100 stations, which has both underground lines and elevated lines

          The project’s D&B contract of the Green line underground project has been given to a JV led by PORR Bau, Saudi Bin Laden Group and Hamad Bin Khalid Contracting.


          Truemax Solutions:

          Total concrete equipments solution and accessory. Included the mixer, mold, gantry crane, pumping, placing, galvanize steel walk way etc.    


          Job Site: Qatar


          一本无码中文字幕高清在线
          <dfn id="3gbql"><s id="3gbql"></s></dfn>

              <th id="3gbql"><video id="3gbql"><acronym id="3gbql"></acronym></video></th>

              1. <th id="3gbql"></th>

              2. <code id="3gbql"><nobr id="3gbql"><track id="3gbql"></track></nobr></code>
                  <strike id="3gbql"><address id="3gbql"></address></strike>
                1. <nav id="3gbql"></nav>